| Pedestrian Paving & Construction |
|
First we mark out the area to be paved and excavate to a depth of 125mm (5 inches) or more, depending on the thickness of the paving to be laid.
We then install any drainage and manhole covers are required and fill the excavated area with Type1mot sub-base material and compact to a depth of at least 75mm (3 inches). We lay the paving on a full bed of mortar whilst maintaining any falls that are needed to allow water to run off.
The paving is then hand pointed to give a long lasting hardwearing finish. |