| Driveway Construction |
|
First we mark out the area where the new driveway is to be constructed and excavate to a depth of at least 225mm (9 inches)
We then install the edge restraints which are either kerbs or block pavers set into a concrete foundation. It is important that this is done to stop the driveway from collapsing and moving.
The driveway is then brushed thoroughly to remove any debris. We then apply kiln dried sand and sweep across the whole area making sure all the joints between the blocks are full. The driveway is then compacted and any excess sand is brushed off. |







